Inground Pool Installation Process

At Dreemer Pool & Remodeling, we follow a structured and professional process to ensure every inground pool is built with precision, safety, and long-term durability. From planning to final startup, our team handles every step from start to finish.

Step 1 — Consultation & Design

We begin with a detailed consultation to understand your vision, space, and budget. Our team will design a custom pool layout that fits your property and meets all local building requirements.

Step 2 — Permits & Planning

Before construction begins, we obtain all required permits and approvals. We ensure the project meets city codes, HOA requirements, and safety regulations.

Step 3 — Excavation

Our crew carefully excavates the pool area according to the approved design. Proper grading and measurements are critical to ensure structural stability.

Step 4 — Steel & Structural Framing

Reinforced steel is installed to create the structural framework of the pool. This step provides strength and prevents cracking or shifting over time.

Step 5 — Plumbing & Electrical Installation

All plumbing lines, drains, returns, skimmers, and electrical components are installed. This includes pump, filter, heater, lighting, and automation preparation.

Step 6 — Gunite / Shotcrete Application

Concrete (gunite or shotcrete) is applied to form the solid shell of the pool. This creates the permanent structure of the pool.

Step 7 — Tile, Coping & Decking

Tile and coping are installed around the pool edge, followed by decking, concrete, or pavers depending on the design.

Step 8 — Interior Finish

Plaster, pebble, or other interior finishes are applied to seal the pool and give it its final appearance.

Step 9 — Equipment Setup & Final Inspection

All equipment is installed and tested. We perform full inspections to ensure everything is operating safely and correctly.

Step 10 — Fill, Balance & Startup

The pool is filled, chemicals are balanced, and the system is started. We provide full instructions on operation and maintenance.

Above Ground Pool Installation Process

Dreemer Pool & Remodeling also provides professional above-ground pool installation for homeowners who want a faster and more affordable swimming pool option without sacrificing quality.

Step 1 — Site Evaluation

We inspect the installation area to make sure the ground is level, stable, and suitable for the pool size.

Step 2 — Ground Preparation

The area is cleared, leveled, and compacted to create a solid foundation. A proper base is critical to prevent shifting or damage.

Step 3 — Base Material Installation

Sand, gravel, or foam padding is installed to protect the pool liner and create a smooth surface.

Step 4 — Pool Frame Assembly

The pool wall, frame, and supports are assembled according to manufacturer specifications to ensure strength and safety.

Step 5 — Liner Installation

The pool liner is carefully installed to prevent wrinkles and leaks.

Step 6 — Plumbing & Equipment Setup

Pump, filter, hoses, skimmer, and return lines are installed and connected.

Step 7 — Fill & System Test

The pool is filled with water while the system is checked for leaks, pressure, and proper circulation.

Step 8 — Chemical Balance & Startup

Water is chemically balanced and the filtration system is fully tested to ensure the pool is ready for safe use.

Step 9 — Final Walkthrough

We explain how to operate the equipment, maintain the water, and keep your pool in excellent condition.